Description
1. Material: High density EVA. 2. The best performance is 175cm-190cm.
This is a 2.6-metre-high costume.
3. Product time: approx. 25-30 days. 4. Set the lights on the armor as needed
- Bumblebee Clothing
- Robot clothing
Production Capacity:
Not informed
Delivery Timeframe:
Within 30 Days
Incoterms:
Not informedPackaging Details:
Not informed
More about
Chengdu Superqueen Art
Not informed
Not informed
Not informed
Not informed
Year
Established
Business type
- Industry / Manufacturer
Keywords
- robot suit
- transforming costume
Contact and location
-
Cici ********
-
+86 28********
-
Chengdu / Sichuan | China